venfree/Wiki/KNX Planning – Process from Start to Commissioning

KNX Planning – Process from Start to Commissioning

A KNX installation should be fully planned before devices are ordered and cables installed. The planning process covers five phases: requirements analysis, design, device selection, ETS configuration and commissioning.

Phase 1–3: Requirements, Design, Device Selection

Requirements analysis: Which rooms will be KNX-controlled? Which functions per room (lighting, blinds, heating, presence)? Control via push button, app or voice? Security requirements?

Design: plan topology (number of lines, line couplers), define GA scheme, dimension distribution board (DIN units), sketch cable routing. Device selection: channels per device vs. required channels, manufacturer mix, cost calculation, venfree automates this step from the room plan.

Phase 4–5: ETS Configuration and Commissioning

ETS configuration: create project, import devices (.knxprod), set parameters, assign GAs, link COs. Then: plausibility check (DPT warnings, missing flags, duplicate GAs).

Commissioning: assign physical addresses (programming button), download application programs, test all functions (bus monitor). Documentation: back up .knxproj, export GA list, handover to owner.

Key Facts

  • Complete planning before installing cables
  • Defining the GA scheme upfront prevents errors
  • venfree automates device selection from the room plan
  • ETS Professional required for download
  • Back up .knxproj after commissioning, always